Emulent Let’s Talk
Skip links

How to write a website design RFP (request for proposal): template and example

Author: Bill Ross, founder of Emulent Published Updated Article

A website design RFP gives agencies the same brief, constraints, and evaluation criteria so their proposals can be compared fairly. It is most useful when the project is complex, involves several stakeholders, or has a meaningful budget. Before writing one, decide what the site must accomplish and which decisions the agency will be expected to make.

A website design RFP (request for proposal) is the document that tells agencies what your organization does, what the new site must achieve, which requirements are fixed and how you will choose a winner. A good one attracts qualified agencies and returns proposals priced against the same scope. Plenty of RFPs fail in one of two ways. Vague ones get boilerplate replies; overly rigid ones lock out the agencies best placed to improve your plan. This Emulent guide covers what to put in, how to order it and what a finished version looks like, ending with a section-by-section template.

What is a website design RFP, and when should you write one?

The RFP should solve a real coordination problem, not create paperwork for its own sake. If the project is small and straightforward, a concise brief and a few structured conversations may be enough.

A website design RFP is a formal invitation for vendors to bid on a defined web project. It sets out your organization, the current site, your goals, the technical requirements, the schedule and the scoring method, so each agency can answer with a scoped, priced plan rather than a capabilities brochure.

Smaller projects often do not need one. For a 15-page brochure site, a written brief and a call with one or two agencies is usually faster and produces an equally good result. An RFP is worth the effort when any of these apply:

  • The project is large.
  • Procurement or governance rules require competitive bids, as they do at most public bodies.
  • The technical or strategic needs are complicated.
  • Several departments have requirements that must sit in one document.

Write the RFP as an opening move in a discussion, rather than a locked specification. Agencies should bring their own judgment instead of ticking boxes, and the best RFPs give enough context for an agency to raise a point you missed.

What should you do before writing your RFP?

Before contacting agencies, agree internally on the problem the website must solve, who will use it, and how success will be measured. Unresolved decisions inside the business become delays during the project.

Before writing your RFP, get internal agreement on goals, budget and the measures of success. Muddled thinking going in produces proposals that cannot be compared, and teams that skip this step often pick a vendor on bad information, then discover the mismatch halfway through the build.

Task What to do
Define the problem the site must solve “We need a new website” gives an agency nothing to aim at. “The site produces 12 qualified leads a month and we need 40” is a target an agency can design for and report against.
Set a realistic budget range With a range in hand, an agency can tell you plainly whether your goals fit and which tradeoffs the figure forces. Leave it out and the proposals you receive will cover scopes that differ by a factor of five.
Identify every internal stakeholder Marketing, IT, sales, legal and the executive team can each add requirements that change scope, technology or content. Gather them now, before they turn into change orders.
Review current performance Export your GA4 data, review the Core Web Vitals report in Google Search Console and write down the gaps the rebuild has to close. Since Interaction to Next Paint replaced First Input Delay as a Core Web Vital on March 12, 2024, set targets for LCP, INP and CLS.
Separate fixed decisions from open ones The CMS, the accessibility standard or the host may already be chosen. Visual design, information architecture and content strategy may still be open. Labeling each stops agencies from proposing workarounds to requirements you will not change.

Performance targets belong in the RFP because most sites miss them today. The HTTP Archive’s 2025 Web Almanac, drawing on July 2025 Chrome User Experience Report data, found that only 48% of mobile sites and 56% of desktop sites had good Core Web Vitals.

For fixed platform decisions, we usually recommend WordPress, hosted on Kinsta, and Shopify for ecommerce builds. If your team has already chosen a platform, state it in the RFP.

What sections should every website design RFP include?

Every website design RFP should cover who you are, what you need, the technical requirements, timing and budget, and how you will make the decision. The list below fits most mid-size and large projects. A small project can trim each section and keep the same core.

  • Organization overview. Explain what you do, who your customers are, your size and market position, and the job the website does for the business. Give an agency from outside your industry enough to understand your buyers and competitors.
  • Project background and goals. Say why the project is happening now (a rebrand, a change in business model, falling metrics, aging technology) and rank the goals. Make each one measurable, for example a 40% increase in organic traffic within 12 months.
  • Current site. Give the URL, the CMS, a rough page count, performance figures and the problems to fix, which tells agencies whether they are quoting a redesign or a full rebuild.
  • Audiences. Name the primary and secondary groups, what each one comes to the site to do and any research you hold on current engagement.
  • Functional and technical requirements: CMS, hosting, integrations, accessibility standard, speed targets, supported browsers and devices, security and sector compliance. “Must integrate with Salesforce via API” is a requirement; “should work with our CRM” is a wish.
  • Design and brand. State whether brand guidelines exist, whether the agency should follow them or refresh them, and any styles you want tried or ruled out.
  • Content and migration. Specify who writes new copy, how many pages exist today, how many move across and whether migration is in scope. Disputes over who owns content are among the most frequent causes of blown budgets and late launches.
  • SEO: a clean page hierarchy and URL scheme, editable meta tags, Schema.org markup, Core Web Vitals targets and a 301 redirect for every URL that changes. If you have rankings worth keeping, ask how each agency will protect traffic through launch.
  • Timeline. Give the target launch date and any immovable dates, such as a product release, a trade show or the start of the fiscal year, and ask agencies to flag schedule risks.
  • Budget. Share the range and say whether it covers copywriting, photography, stock licenses or ongoing maintenance.
  • Proposal format and scoring. List the required format, page limits, the questions to answer, the deadline and how to submit, along with each scoring criterion and its weight.

Name an exact accessibility standard. The DOJ’s 2024 ADA Title II rule covers state and local governments, public colleges and courts, and requires WCAG 2.1 Level AA. On April 20, 2026, the DOJ extended the compliance dates by one year: entities serving 50,000 or more people now have until April 26, 2027, and smaller entities and special district governments until April 26, 2028. Private businesses fall under Title III, which has no fixed technical standard, though RFPs and legal settlements usually cite WCAG 2.1 or 2.2 AA. Few sites clear that bar today. The WebAIM Million 2026 report detected WCAG 2 failures on 95.9% of the top one million home pages, an average of 56.1 errors per page.

What questions should you ask agencies in your RFP?

The questions you ask agencies should force them to describe specific past work, because broad questions draw broad answers. “Tell us about a redesign where the site kept its organic traffic” says far more about SEO skill than “describe your SEO approach.”

  • Walk us through a project close to ours in scope or sector: the approach, what went wrong and the measured results, such as changes in traffic, conversion rate or load time.
  • Who will run our project day to day, and what is that person’s background? Senior staff often write the proposal and then hand the work to someone else. Naming the lead up front heads off a bait-and-switch.
  • What happens in discovery, and what will you need from our staff? The answer shows how many internal hours the project will consume on top of the fee.
  • How will you protect our current rankings? An agency without a clear answer on redirect mapping, before-and-after crawl comparisons in a tool like Screaming Frog, and post-launch monitoring in Google Search Console is likely to treat SEO as an afterthought.
  • How do you handle changes in scope? You want a written, transparent change-order process, not surprise invoices.
  • What testing happens before launch? A good answer names cross-browser and device testing, accessibility checks, performance testing and broken-link scans.
  • What do you need from us to hit the schedule, and which client-side problems most often cause delays? Agencies that answer in detail have shipped enough projects to know.

What should a website design RFP template look like?

A website design RFP template has a cover page followed by thirteen numbered sections. Scale each part up or down to match the size of the build and the rules your procurement office sets.

Website design RFP template, part by part
Part Contents
Cover pageOrganization name, project title, issue date, due date, a named contact for questions and submission instructions.
1. About our organizationTwo or three paragraphs: what you sell, to whom, where you sit in the market and how the site feeds marketing and sales.
2. Project overview and goalsWhy the work is happening this year, goals ranked by importance and the metrics you will report for 12 months after go-live.
3. Current website assessmentAddress, CMS, page count, monthly sessions, conversion rate on the main goals and known faults.
4. Target audienceMain and secondary visitor groups, the task each one arrives to complete, how they make buying decisions and any research you hold.
5. Functional and technical requirementsPlatform, host, integrations, accessibility level (WCAG 2.1 AA, say), speed goals, browser and device coverage, security and regulatory needs.
6. Design and brand requirementsHow binding your style guide is, visual directions to test or skip, and three to five reference sites with a sentence on what you like.
7. Content responsibilitiesWho drafts copy and who moves it; pages that transfer as is, pages to rewrite and new pages; a page total if the agency writes.
8. SEO requirementsOn-page structure, the 301 redirect map, Core Web Vitals goals, structured data, an XML sitemap and Google Search Console configuration.
9. Project timelineGo-live target, immovable dates and the expected kickoff.
10. BudgetThe range, with a note on whether copy, photos, stock licenses and upkeep sit inside or outside it.
11. Proposal requirementsFirm background, comparable work, method, staffing, schedule and line-item pricing, along with format, page cap, deadline and delivery method.
12. Evaluation criteriaFactors and weights. A workable split: experience 25%, approach 30%, team 20%, timeline 10%, price 15%.
13. Procurement processDates for the question period, shortlist notice, presentations and the award.

What contract and ownership provisions should the RFP address?

Four provisions belong in the RFP itself: who owns the work, who holds the accounts, what the warranty covers and how support is priced. Once you name a winner, you have far less room to bargain. Agencies that see these terms up front can build them into the quote, and firms whose boilerplate contracts clash with them drop out early.

  • Design files, source code, copy and documentation pass to you in full when the last invoice is paid. A minority of studios retain title and grant clients a license instead, so put the question in writing.
  • A defect warranty, usually 30 to 90 days, obliges the agency to repair post-launch bugs for free. Request each bidder’s exact wording.
  • Your organization, never the vendor, registers GA4, Google Search Console, the Kinsta or other hosting account, the domain and the top-level CMS login. If you part ways, the site stays under your control.
  • Bidders should quote care plans and retainers too, which lets you total the cost of each relationship across two to three years.

Silence on these points is where projects go wrong. Companies have launched a site only to find the agency still holds the source files, the CMS administrator login sits with the vendor, or every small text change triggers a billable ticket. A single paragraph in the RFP rules out all three outcomes.

How do you evaluate proposals once you receive them?

Evaluate proposals by scoring each one against the criteria you published, so that a glossy document cannot beat a plain one that actually answered your questions.

  • Ask three or four colleagues to score every proposal on their own in a shared spreadsheet (one row per agency, one column per criterion), then talk through the disagreements rather than averaging them away.
  • Invite the top two or three agencies to present or join a structured call, and watch how the team communicates and handles questions it did not expect.
  • Phone two or three references per finalist from comparable projects. Ask about schedule, communication, how problems were resolved and whether the finished site matched the proposal.
  • Give weight to proposals that show a specific grasp of your business, audiences and site problems, since that attention to detail tends to carry into the build.

Scoring has a blind spot. A heavy, document-driven process rewards agencies that write strong proposals, and that skill is separate from building strong sites. The live presentation and the reference calls are where you correct for it.

How does a strong RFP lead to better project outcomes?

A strong RFP pays back twice: once when you pick the vendor and again across the months of the build. Bidders handed a precise document email fewer clarification requests, produce tighter quotes and arrive at kickoff knowing what success means to you. Thorough preparation also marks you as an organized client, and the busiest agencies use that signal when deciding which bids are worth their time.

A well-written RFP gives agencies enough detail to propose a realistic solution and gives your team a fair way to compare them. At Emulent, we can help review the brief and the proposals. Get in touch with us to discuss your project.

Want a second set of eyes on your marketing? We’ll show you the math before asking for a contract. No long-term lock-ins.
Let’s Talk